Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Long view of Redwood Creek with pedestrian bridge in the distance.

Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Finding of No Significant Impact (FONSI)


The Finding of No Significant Impact (FONSI) document below includes the following content:

- Finding of No Significant Impact (FONSI)
- Attachment A: Best Management Practices (BMPs) and Regulatory Requirements
- Attachment B: Guidelines to Minimize Phytophthora Contamination in Restoration Projects by the Working Group for Phytophthoras in Native Habitats (incl. Appendix)


The Determination of No Impairment (DNI) document below includes the following content:

- Determination of No Impairment (DNI)
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.