PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

FONSI


Planning and analyzing impacts of the proposed AC34 was the subject of a multi-agency NEPA process, including the U.S. Coast Guard, the U.S. Army Corps of Engineers and The Presidio Trust. The U.S. Coast Guard was a co-lead agency under NEPA and the other partners are cooperating agencies. Collectively, these agencies and the NPS are referred to as "the
federal team." All four agencies will prepare their own FONSIs. This FONSI, Environmental
Assessment (EA) and Errata Sheets (prepared as a technical attachment to the EA) comprise the
complete record of environmental impact analysis for the project for the NPS. It should be noted
that this is a multi-agency partnership initiative, with each participating agency responding to
somewhat different requirements this decision including Project stipulations pertain to NPS,
and does not substitute for approval by other agencies for their proposed activities.
 
Document Content:
FONSI   (2.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.