PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Poison Hemlock Eradication Plan


Draft Eradication Plan
 
Comment Period: Closed        Mar 30, 2015 - Apr 13, 2015
Document Content:
Draft Poison Hemlock Plan.doc   (883.5 KB, Word file)
Poison Hemlock_Project Area Map.pdf   (10.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.