Finding of No Significanr Impact, Charlestown Navy Yard Master Development Strategy Phase I


On March 17, 2023, Northeast Regional Director Gay Vietzke approved the Finding of No Significant Impact for the Environmental Assessment (EA) for the Charlestown Navy Yard Master Development Strategy Phase I. This approval formalizes the National Park Service approval of Alternative 1 as described in the EA, which includes (1) constructing a Gateway Center that combines the existing USSCM and NPS visitor center into a consolidated facility at the primary entrance to the CNY, on the site of the to be demolished Hoosac Stores Building adjacent to Gate 1 and (2) replacing Building 109 on Pier 1 with an open frame structure to provide a centrally located area for visitor orientation and programming.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.