PEPC and Parkplanning will be offline Weds. December 11th starting at 7:00 AM MT for scheduled maintenance. Expected downtime is up to four hours.

Preserve Historic Peirce Mill


The NPS proposes to rehabilitate and reopen Peirce Mill as an operating water-powered mill that will meet the interpretive and educational missions of the park. The rehabilitation would be informed by the 2009 Peirce Mill Complex Cultural Landscape Report and would be accomplished in a manner that protects the historic fabric of the mill to the maximum extent possible and improves safe movement of and accessibility by visitors throughout the site.
 
Comment Period: Closed        Jan 18, 2010 - Feb 17, 2010
Document Content:
Preserve Historic Peirce Mill   (3.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.