Project Links
George Washington Memorial Parkway » Arlington County and Vicinity Non-Motorized Boathouse Facility EA » Document List » Document Contents

Earlier Work - 2002 Arlington Boathouse Feasibility Study
This "feasibility study", officially titled Facility and Site Analysis for a Boathouse on the Potomac River at Arlington County and Vicinity, was completed in 2002 in order to fulfill a 1998 Congressional request.
The study discusses the potential issues and locations of the facility. Gives good background information of earlier stages of planning for this project; however, it should be noted that site specific designs and other general information are no longer relevant. The next steps of the current EIS planning process will update this information.
![]() |
Document Content: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems. |