PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Civic Engagement Public Comment Report and Public Comments (Sept 2023)


A report summarizing the results of the April 2023 civic engagement meetings on the Frozen Lake Surface Access and Use Plan. The full text of public comments received is also included here.
 
Document Content:
VOYA Civic Engagement Comment Report   (936.7 KB, PDF file)
VOYA_Full Public Correspondence   (920.8 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.