National Park Service Logo
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents
Grand Prismatic Spring

Fairy Falls Additional Information

In addition to the project description on the home page, please review the attached documents below. After reviewing the materials, feel free to provide feedback below on the proposed project. The comment period will be open from March 17th to April 1st, 2017.
 
Comment Period: Closed        03/17/2017 - 04/01/2017
Document Content:
Proposed Parking DesignProposed Parking Design   (60.6 KB, Image file)
Photo of proposed lot looking upstreamPhoto of proposed lot looking upstream   (851.2 KB, Image file)
Photo of proposed lot looking downstreamPhoto of proposed lot looking downstream   (816.7 KB, Image file)
Proposed Parking LocationProposed Parking Location   (689.2 KB, PDF file)
Fairy Falls Monitoring PlanFairy Falls Monitoring Plan   (71.9 KB, PDF file)
Fairy Falls Re-vegetation PlanFairy Falls Re-vegetation Plan   (97.1 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note:Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.