Project Links
Great Basin National Park » Lehman Caves Management Plan » Document List » Document Contents
Lehman Caves Management Plan Draft EA
The purpose of this plan is to provide a consistent framework for managing Lehman Caves. The plan is needed to address resource protection issues and support sustainable public enjoyment, education, and research efforts.
Comment Period:
Closed
Jul 15, 2019 - Aug 14, 2019
|
Document Content: |
LCMP draft EA.pdf
(2.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |