PEPC and Parkplanning will have an outage from 5 PM to 10 PM MT on July 19th due to network maintenance. Please plan and save your work accordingly.

Construct Accessible Hunt Blind and Wildlife Viewing Platform EA


This is the environmental assessment documentation on the construction of a new accessible hunt blind and wildlife viewing boardwalk and platform. This project would include a concrete parking lot, interpretive signage, an approximate 260 foot long elevated boardwalk to a partially covered platform over an open pond within the federally authorized hunt area on Bodie Island.

This document also includes a Floodplain Statement of Findings for constructing a facility within a 100-year floodplain.
 
Comment Period: Closed        Feb 4, 2019 - Feb 20, 2019
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.