Project Links
Federal Agencies - other than NPS » DWH NRDA Restoration - Louisiana TIG Phase 2 Draft Restoration Plan/EA #1.1: Queen Bess Island Restoration » Document List » Document Contents
Louisiana Trustee Implementation Group Phase 2 Restoration Plan/Environmental Assessment: Queen Bess Island
This draft plan evaluates two project alternatives and a no action alternative. The preferred alternative would create 37 acres of bird habitat, 30 for brown pelicans and 7 for terns and skimmers. The estimated cost of the preferred alternative is $16.7 million.
| 
	Comment Period: 
    
  	Closed       
    Dec 7, 2018 - Jan 22, 2019
 | 
|  | 
| Document Content: | 
| Queen Bess Island Draft Phase 2 RPEA 111518_508 Compliant.pdf
            (10.4   MB, PDF file)
         Disclaimer: Links within the above document(s) were valid as of the date published. Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. | 
