Project Links
Midwest Regional Office » Stabilization of Pullman Administration Building and install visitor center » Document List » Document Contents
PULL VC 65% Design Development
These are the proposed construction for the visitors center.
Comment Period:
Closed
Nov 19, 2018 - Dec 4, 2018
|
Topic Questions: |
1. Does this design adversely impact intact cultural resources? If so, how? |
Document Content: |
Architectural drawings.pdf
(419.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |