Revised Draft Final Engineering Evaluation/Cost Analysis for Grant Grove Burn Dumpsite


Avatar Environmental, LLC (Avatar) was retained by the National Park Service (NPS) to conduct an Engineering Evaluation/Cost Analysis (EE/CA) at the Grant Grove Dumpsite Solid Waste Management Unit No.38 (Site) located within the Sequoia and Kings Canyon National Parks (SEKI) in Fresno County, California. Avatar Environmental, LLC and Geocon Consultants, Inc. (Geocon), a subcontractor to Avatar, have prepared this EE/CA to evaluate potential human and ecological risk and, if needed, potential response activities for the Site.

This EE/CA has been prepared in accordance with the Comprehensive Environmental Response, Compensation, and Liabilities Act (CERCLA) and the U.S. Environmental Protection Agency Guidance on Conducting Non-Time-Critical Removal Actions and associated guidance from NPS. This EE/CA is also prepared in accordance with the requirements provided in Section 300.415(b)(4)(i) of the National Oil and Hazardous Substances Pollution Contingency Plan.
 
Comment Period: Closed        Aug 10, 2018 - Sep 10, 2018
Document Content:
Revised Draft Final EECA Tables 1-16   (228.2 KB, .xlsx file)
Revised Draft Final EECA Table 17   (37.8 KB, .docx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.