Project Links
Yosemite National Park » Replace the Big Oak Flat Welcome Center Complex » Document List » Document Contents
Big Oak Flat Public Scoping - Materials
The first document is a Factsheet regarding the project initiation and public scoping period for the Replacement of the Big Oak Flat Visitor Contact Station and Emergency Services Facilities Environmental Assessment. The second document is a presentation prepared for the Public Scoping Meeting (held 5/18/18). The last document is posters that were displayed at the Public Scoping Meeting (held 5/18/18).
Comment Period:
Closed
May 4, 2018 - Jun 4, 2018
|
Document Content: |
Public Scoping Meeting Banners.pdf
(25.2 MB, PDF file)
BOF EA Public Scoping Presentation_508.pdf
(3.6 MB, PDF file)
20180424_BOF_Factsheet.pdf
(893.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |