Project Links
Natchez Trace Parkway » Issuance of a NPS Right-of-Way to TVA for Construction of an Aerial Power Line Near Milepost 159.2 » Document List » Document Contents
Construction of the Red Hills-Kosciusko 161-kV Transmission Line Across the Natchez Trace Parkway
Environmental assessment and wetlands statement of findings document to address the impacts of the issuance of a new National Park Service right-of-way to Tennessee Valley Authority for the construction of a 161-kV transmission line across approximately 2,000 feet of the Natchez Trace Parkway.
Comment Period:
Closed
Nov 3, 2017 - Dec 2, 2017
|
Document Content: |
NATR FINAL TVA EA and WSOF for Public Review Posting 11.3.2017.pdf
(19.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |