Project Links
Gates Of The Arctic National Park and Preserve » Ambler Mining District Industrial Access Project EEA » Document List » Document Contents
Project Summary for Scoping Phase - September 2017
Basic project description and background information for solicitation of public comment during the initial scoping phase from September 2017 through January 2018.
Comment Period:
Closed
Sep 27, 2017 - Jan 31, 2018
|
Document Content: |
Ambler EEA Summary.pdf
(468.6 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |