Project Links
National Trails System » Butterfield Overland Trail Special Resource Study » Document List » Document Contents
Termination of the Environmental Assessment Process for the Butterfield Overland Trail Special Resource Study
The National Park Service is terminating the Environmental Assessment for the Butterfield Overland Trail Special Resource Study. The study will be completed and presented to Congress in 2017.
Document Content: |
BUOV Press Release EA to CE 20161207.pdf
(693.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |