Project Links
San Juan National Historic Site » Draft Grounds Maintenance Standard Operating Procedure » Document List » Document Contents
Draft Grounds Maintenance Plan
The purpose of this standard operating procedure (SOP) is to establish clear guidelines for the care of the maintained landscape areas at San Juan National Historic Site (SAJU). This SOP will focus on the maintenance of turf and the care of existing trees and shrubs in park jurisdiction. The park will also establish through this SOP limits to where re-vegetation efforts should happen as well as when such efforts will be deemed convenient. The park will also establish guidelines for removing vegetation from an existing maintained landscape area.
Comment Period:
Closed
Jul 1, 2016 - Aug 31, 2016
|
Document Content: |
Draft Grounds Maintenance Standard Operating Procedure.pdf
(360.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |