Project Links
Yosemite National Park » Merced River Plan Implementation: Construct Yosemite Village Day-Use Parking Area » Document List » Document Contents
Intent to Rely on NEPA Document
The California Regional Water Quality Control Board has determined that the Merced River Plan EIS meets the requirements of CEQA. Accordingly, the Central Valley Water Board proposed to use the EIS instead of preparing a new CEQA document for the purposes of a Water Quality Certification. The public notice is beign circulated for 30 days pursuant to section 15225 of the CEQA Guidelines.
Comment Period:
Closed
Apr 26, 2016 - May 27, 2016
|
Document Content: |
Yosemite Village NEPA public notice.pdf
(51.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |