PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Environmental Assessment for the Siskiwit Dock Project


Through this Environmental Assessment (EA), the National Park Service (NPS) is evaluating the proposed removal of Siskiwit Bay dock and breakwater at Isle Royale National Park as articulated in the park's General Management Plan (GMP).
 
Comment Period: Closed        Apr 20, 2016 - May 22, 2016
Document Content:
2016.04.14_Siskiwit Dock EA.pdf   (1.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.