Self Evaluation and Transition Plan


Background information on the Self Evaluation and Transition Plan, and the Final Draft SETP for Lava Beds National Monument and the Tule Lake Unit, WWII Valor in the Pacific National Monument.
 
Comment Period: Closed        Dec 1, 2015 - Dec 31, 2015
Document Content:
Final Draft TULE SETP_low.pdf   (2.3 MB, PDF file)
Final Draft_LABE SETP_low.pdf   (4.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.