Project Links
Redwood National Park » Conduct CERCLA Response at Firearms Range » Document List » Document Contents
Redwood NP Engineering Evaluation Cost Analysis Report
The EE/CA describes the evaluation process for a screening level risk assessment to compare contaminant levels at a site against established values for human health and ecological risk. Based on the contaminant levels at the site, objectives for cleanup to protect human health and the environment have been developed.
Comment Period:
Closed
Jun 25, 2015 - Aug 15, 2015
|
Document Content: |
Redwood NP Engineering Evaluation and Cost Analysis Report 06-09-15.pdf
(7.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |