PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Fort Pulaski Bridge Finding of No Significant Impact (FONSI) May 2015


The NPS and FHWA have selected Alternative H (as described in the March 2015 Environmental Assessment) for implementation. The Selected Alternative will not have a significant effect on the human environment. Environmental impacts that could occur are limited in context and intensity, with generally adverse impacts that are localized, short- to long-term, and range from negligible to moderate. There are no unmitigated adverse effects on public health and safety, threatened or endangered species, sites or districts listed in or eligible for listing in the National Register of Historic Places or other unique characteristics of the region. No highly uncertain or controversial impacts, unique or unknown risks, significant cumulative effects, or elements of precedence were identified. Implementation of the action will not violate any Federal, State, or local environmental protection law. Based on the foregoing, it has been determined that an EIS is not required for this project and thus will not be prepared.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.