PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

San Jose Drive Area


This EA covers the rehabilitation of part of the cultural landscape around San Jose Drive north of Mission San Jose. The project also includes enhancing some visitor services.
 
Comment Period: Closed        May 22, 2015 - Jun 22, 2015
Document Content:
SanJoseEA_Draft_May2015.pdf   (2.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.