PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Green Island Erosion Control Plan


Two areas of erosion are located on the shoreline near the east end of Green Island first noticed in the summer of 2014. These areas of erosion are likely to continue eroding over time, especially if foot traffic increases because of improved acess with the repair of the walkway under the highway bridge. The larger of the two areas is about 10 feet long, 3 feet wide, and 3 feet deep. To repair these areas the park could place erosion control jute mat (made out of plant material) along with grass and herbaceous plant seed collected on site onto the exposed sand. The mat would halt further erosion by wind and rain, allowing the seed to germinate and put down roots which would ultimately stabilize the sandy soil as the mat biodegrades. Additionally cottonwood and willow live stakes collected on site or nearby could be placed within and around the erosion areas to further stabilize the area from waves.
 
Document Content:
GI_erosion_control_2015.docx   (792.9 KB, .docx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.