Project Links
Redwood National Park » Conduct CERCLA Response at Firearms Range » Document List » Document Contents
Alder Camp Road Firing Range Cleanup Fact Sheet
The Fact Sheet outlines the process for developing an Engineering Evaluation/Cost Analysis to determine whether cleanup of lead and other heavy metals is necessary at the Alder Camp Road Firing Range in Redwood National Park.
Topic Questions: |
1. please refer to the Stakeholder Questionnaire for Topic Questions |
Document Content: |
Stakeholder_Questionnaire_-_FINAL_-_10-28-14.pdf
(96.9 KB, PDF file)
Alder Camp Road Fact Sheet -FINAL -10-29-14 -.pdf
(636.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |