Project Links
San Francisco Maritime National Historical Park » Rehabilitate Historic Promenade Pavement to Improve Safety » Document List » Document Contents
Alternative B1, Preferred Alternative: Site Plan
Alternative B1
Preferred Alternative
Site Plan
Remove State Beltline Railroad Tracks and Replace with Concrete Pavement (Excluding Upper Fork) and Connect Promenade to Van Ness Avenue, Forming Accessible Multi-use Path
1/30/14
Comment Period:
Closed
Jan 31, 2014 - Apr 30, 2014
|
Document Content: |
Promenade_Alt_B1_Site_Plan.JPG
(3.7 MB, Image file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |