Project Links
Point Reyes National Seashore » Drakes Bay Oyster Company Special Use Permit Environmental Impact Statement » Document List » Document Contents
Final Environmental Impact Statement Drakes Bay Oyster Company Special Use Permit
The NPS has used the NEPA process to engage the public to evaluate the effects of issuing a Special Use Permit (SUP) for the commercial shellfish operation of Drakes Bay Oyster Company at Point Reyes National Seashore. As the culmination of the NEPA process, the NPS is making available the Final Environmental Impact Statement (EIS) assessing four alternatives and identifying the environmentally preferable alternative. However, it should be noted that Section 124 of Public Law 111-88 provides that the Secretary's decision whether to issue this permit is "notwithstanding any other provision of law." As such, the NPS has not identified a preferred alternative in the Final EIS.
Document Content: |
Front Matter Final EIS PORE DBOC SUP November 2012
(3.7 MB, PDF file)
Chapter 1 Final EIS PORE DBOC SUP November 2012
(4.2 MB, PDF file)
Chapter 2 Final EIS PORE DBOC SUP November 2012
(3.8 MB, PDF file)
Chapter 3 Final EIS PORE DBOC SUP November 2012
(2.3 MB, PDF file)
Chapter 4 Final EIS PORE DBOC SUP November 2012
(1.9 MB, PDF file)
Chapter 5, References, Glossary, Index Final EIS PORE DBOC SUP November 2012
(544.1 KB, PDF file)
Appendices Final EIS PORE DBOC SUP November 2012
(28.4 MB, PDF file)
Full document Final EIS PORE DBOC SUP November 2012
(43.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |