PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Grazing Exclosures EA 02-06-12


The NPS proposes to install 18 grazing exclosure fences for 30-50 years at Bering Land Bridge National Preserve.
 
Comment Period: Closed        Feb 7, 2012 - Mar 8, 2012
Document Content:
BELA Exclosures EA 02-06-12   (868.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.