Project Links
Yosemite National Park » Ahwahnee Comprehensive Rehabilitation Plan » Document List » Document Contents
Ahwahnee Comprehensive Rehabilitation Plan - FONSI, Programmatic Agreement, and other determinations
This Finding of No Significant Impact (FONSI) documents the decision of the National Park Service to adopt a comprehensive plan for phased, long-term rehabilitation of The Ahwahnee. An environmental assessment analyzing rehabilitation alternatives was available for public review and comment July/August 2011.
The Selected Action is substantively the same as described for the Preferred Alternative (Alternative 3) in the environmental assessment. To view the environmental assessment, see the separate posting in PEPC by clicking on the "Document List" on the lefthand side of the screen.
The final decision package (files posted below) consists of the following:
-Finding of No Significant Impact
-Errata sheets to the environmental assessment
-Programmatic Agreement between the park and the State Historic Preservation Officer
-Wild and Scenic River Section 7 Determination
-Public Comment and Response Report
Implementation of the plan will occur over the long-term as funding becomes available. Initial components of the plan will include improving the East Wing fire egress, reconfiguring The Ahwahnee bar, and accessibility improvements.
Document Content: |
Final Programmatic Agreement between park and SHPO
(214.6 KB, PDF file)
Finding of No Significant Impact
(1.2 MB, PDF file)
Errata sheets to the environmental assessment
(2.3 MB, PDF file)
Letter from Superintendent
(656.0 KB, PDF file)
Wild and Scenic River Section 7 Determination
(1.1 MB, PDF file)
Public Comment and Response Report
(772.1 KB, PDF file)
Full Decision Document Package
(5.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |