Project Links
Devils Postpile National Monument » Devils Postpile National Monument General Management Plan » Document List » Document Contents
Newsletter #3 - Preliminary Alternatives
This newsletter is the third of a series and presents four preliminary alternatives currently under consideration that outline a range of potential management options for the future of Devils Postpile National Monument. The NPS does not have a preferred alternative at this time.
Comment Period:
Closed
Jul 15, 2011 - Sep 30, 2011
|
Topic Questions: |
1. Which ideas of any in the preliminary alternatives do you think should be included in the preferred alternative, and why? |
2. Are there any important elements or ideas that were missed in the preliminary alternatives? Please describe and explain why these additional ideas are important. |
3. Do you have a preference for any one particular alternative? If so, please explain why. |
4. What else would you like the planning team to know as we write the Draft General Management Plan? |
Document Content: |
Newsletter 3 Preliminary Alternatives
(8.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |