Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

National Mall Turf and Soil Reconstruction Environmental Assessment and Finding of No Significant Impact (2010-2011)


National Mall Turf and Soil Reconstruction- EA files for public comment. Also attached is the Finding of No Significant Impact.
 
Comment Period: Closed        Nov 2, 2010 - Dec 7, 2010
Document Content:
FONSI (1-21-11)FONSI (1-21-11)   (1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.