Project Links
National Mall and Memorial Parks » Install Temporary Office Modular Unit at Park Headquarters » Document List » Document Contents
DC SHPO Concurrence 08-17-10
DC SHPO concurs with the NPS determination of "no adverse effect" because the proposed office modular unit will be temporary, located in a relatively remote corner of East Potomac Park, not highly visible, and will be screened with additional vegetation to avoid any adverse visual effects. However, this determination is conditioned upon the removal of the temporary office modular unit once the permanent NAMA Headquarters facilities are designed, approved and constructed.
Document Content: |
DC SHPO Concurrence
(74.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |