Project Links
Ozark National Scenic Riverways » Akers Water System Rehab » Document List » Document Contents
Categorical Exclusion for Akers Water System Rehab
This project will replace the existing water lines at Akers which currently provide potable water to the Akers Store and to the Akers Group Campground. It is proposed that the new water lines be set in place along two new utility corridors that will maximize efficiency in light of the opportunity to tie into recently constructed water lines near the new water tank and the new Visitor Center. The new utility corridors will utilize directional bores to avoid disruption and damage to existing forested areas at Akers and to effectively cross two state highway ROWs. A total of 2,900 ft. (approx.) of new water line, run within new utility corridors, will be set in place.
Document Content: |
Categorical Exclusion for Akers Water System Rehab
(104.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |