Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Akers Water System Rehab

Ozark National Scenic Riverways » Akers Water System Rehab » Document List

This project will replace the existing water lines at Akers which currently provide potable water to the Akers Store and to the Akers Group Campground. It is proposed that the new water lines be set in place along two new utility corridors that will maximize efficiency in light of the opportunity to tie into recently constructed water lines near the new water tank and the new Visitor Center. The new utility corridors will utilize directional bores to avoid disruption and damage to existing forested areas at Akers and to effectively cross two state highway ROWs. A total of 2,900 ft. (approx.) of new water line, run within new utility corridors, will be set in place.