Badger Pass Ski Lodge Rehabilitation Environmental Assessment


The Badger Pass Ski Lodge Rehabilitation Environmental Assessment is available for public review and comment through July 7, 2010. Yosemite National Park proposes to provide a phased program for rehabilitation of the Badger Pass Ski Lodge.

The environmental assessment analyzes four alternatives and their potential impacts. The No Action Alternative represents continuing the existing operation and maintenance of the ski lodge (i.e., comprehensive rehabilitation would not occur). Three action alternatives represent a reasonable range of options to satisfy the purpose of and need for the project, while meeting relevant legal requirements. Alternative 2-Essential Repairs and Upgrades, includes rehabilitation of the lodge within the current building envelope involving minimal action to fulfill the basic project needs for repair and code upgrades. Alternative 3-Rehabilitation and Improvements, includes addressing needs for repair, code upgrades, and operational and visitor service improvements while maintaining existing historic integrity (environmentally- and agency-preferred alternative). Alternative 4-Emphasize Historic Character, includes a rehabilitation approach in which the original 1935 ski lodge would be restored to prominence and the non-historic buildings would be replaced with new, more efficient facilities with maximum benefit to operational and visitor service. An analysis of the potential environmental impacts of each alternative and mitigation measures to avoid or minimize those impacts are presented.

To comment on the document, click on the "Comment on Document" link on the lefthand side of this page and submit an electronic comment.
 
Comment Period: Closed        May 19, 2010 - Jul 7, 2010
Document Content:
Badger Pass EA - Full Document   (9.0 MB, PDF file)
Badger Pass EA - Fact Sheet   (98.3 KB, PDF file)
Front/Back Cover   (703.5 KB, PDF file)
Abstract/Table of Contents   (93.3 KB, PDF file)
Executive Summary   (90.1 KB, PDF file)
Chapter 1 - Purpose and Need   (960.5 KB, PDF file)
Chapter 2 - Alternatives   (4.3 MB, PDF file)
Chapter 5 - List of Preparers   (87.8 KB, PDF file)
Chapter 6 - Glossary   (132.8 KB, PDF file)
Chapter 7 - Bibliography   (86.7 KB, PDF file)
Appendix A - Cumulative Projects   (206.6 KB, PDF file)
Appendix B - Mitigation Measures   (148.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.