PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Finding of No Significant Impact Statement for the Cedar Grove Bridge Project


This finding of no significant impact (FONSI), the environmental assessment (EA), the Wild and Scenic Rivers Section 7(a) Determination, and the Floodplains Statement of Findings constitutes the record of the environmental analysis and decision-making for the replacement of the Cedar Grove Bridge within Kings Canyon National Park. The National Park Service (NPS), in cooperation with the Federal Highway Administration/ Central Federal Lands Highway Division (FHWA) will implement alternative B, the replacement of the existing bridge with a 280-foot bridge constructed in the same location. The selected alternative includes a river restoration component.
 
Document Content:
Statement of Findings for Floodplains   (416.6 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.