PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Supplemental Scoping Report January 2010


This document includes information and issues garnered from the second public scoping period for the proposed restoration of high elevation aquatic ecosystems project. Scoping occurred from October 7 through November 21, 2009. Part one of the scoping report includes public input that was received during the previous scoping for this project in 2007. This is posted separately on this website. Both reports will be utilized by the Sequoia and Kings Canyon National Parks (parks) interdisciplinary planning team to identify issues and alternatives related to the proposed restoration of native species in high elevation aquatic ecosystems within the parks.
 
Document Content:
Supplemental Scoping Report 2010   (261.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.