Project Links
Chesapeake and Ohio Canal National Historical Park » Historic Dams 4&5 Eelway Passage Project - Potomac River » Document List » Document Contents
Proposed Eel Ladder Construction at Dams 4 and 5 on the Potomac River, Environmental Assessment / Assessment of Effects, November 2009
You are invited to review the draft Environmental Assessment/Assessment of Effect for the proposed "Eel Ladder Construction at Dams 4 and 5 on the Potomac River" project. You can provide comments, via this website, regarding the proposed construction of eel passages. The passages are proposed to enhance the migration of the American eel and open up 120 miles of river habitat that is critical for the American eel's life cycle, The historic dams were built to supply water for the Chesapeake and Ohio Canal. Today, the dams are owned by the National Park Service and are located in Washington County, MD.
Written comments, either through this website or via postal letter, will be accepted only during a 47 day public review period – closing January 8, 2010. Written comments must be submitted or be postmarked by midnight on January 8, 2010 to be considered.
Hard copies of the environmental assessment are available at Chesapeake and Ohio Canal National Historical Park Headquarters, 1850 Dual Highway, Hagerstown, MD 21740.
Comment Period:
Closed
Nov 23, 2009 - Jan 8, 2010
|
Document Content: |
Appendix A - B
(1.5 MB, PDF file)
Eel Ladder Environmental Assessment
(3.8 MB, PDF file)
Appendix C - E
(4.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |