The project would consist of installation of a 54 x 60 foot
(3240 square foot) pre-engineered steel building in the partially
disturbed area adjacent to the park's current maintenance building (see
attached location map). This would involve installation of a 54x40 foot
concrete pad directly underneath the building and a 50 foot
(approximately) gravel driveway leading from the current maintenance lot
to the new building. It would also involve removal of nearly 1/3 of an
acre of partially disturbed forest vegetation. The project area is
approximately 210 feet from an intermittent stream to the west which
drains into a temporarily/seasonally flooded wetland area to the
southwest.. The building would serve primarily as covered storage space
for maintenance equipment that currently sits uncovered inside a fenced
maintenance yard.
| 
	Comment Period: 
    
  	Closed       
    Jan 29, 2009 - Feb 27, 2009
 | 
|  | 
| Document Content: | 
| Project Location
            (2.0    MB, Image file)
         Project Location 2
            (1.9    MB, Image file)
         Disclaimer: Links within the above document(s) were valid as of the date published. Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. | 