Noonday Creek MultiUse Trail


The EA evaluates four trail and five parking lot alternatives for addressing the purpose and need for action. The EA also evaluates taking only minimal action (Alternative A, No Action) to address critical safety concerns for comparison with the action alternatives. The preferred alternatives include 1) construction of the multi-modal trail on the south side of Old 41 from the Stilesboro intersection to Barrett Parkway; 2) constructing a parking lot outside of the park on property adjacent to the Old 41-CSX bridge to replace the 300 spaces removed from the road shoulders; 3) curb and gutters along the length of Old 41 to prevent roadside parking; and 4) construction of parking lot near Visitor Center in open field adjacent to administrative buildings.
 
Comment Period: Closed        Jul 18, 2008 - Aug 19, 2008
Document Content:
Final Draft Environmental Assessment   (11.5 MB, PDF file)
Appendix   (5.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.