02. Internal Scoping Summary


Attached is a short description of topics discussed during internal scoping. Internal scoping is the inital step in the planning process. During this process, park staff met to identify draft purpose, need, and objectives as well as discuss potential issues to be addressed by the plan.

The summary provides additional background information about the plan and planning process.
 
Document Content:
Internal Scoping Summary   (221.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.