Electrical Supply for Herring Cove Beach Facilities


The purpose of this Environmental Assessment is to address the need to upgrade the present deteriorating underground electric supply line at Herring Cove Beach facilities at Cape Cod National Seashore. The current supply line extends approximately two miles from Provincetown and is in need of direct replacement or provision of an alternate means of electrical supply.

The park needs to provide reliable electrical power to Herring Cove facilities, maximizing use of renewable and non-greenhouse gas producing energy technologies where possible. The purpose of this project is to remedy the ongoing deterioration of the electrical supply to Herring Cove in a manner that maximizes use of renewable and non-greenhouse gas producing technologies.
 
Comment Period: Closed        May 8, 2008 - Jun 7, 2008
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.