Tamiami Trail Modification Limited Reevaluation Report


The U.S. Army Corps of Engineers and the Department of the Interior, represented by the National Park Service and the U.S. Fish and Wildlife Service, have reevaluated alternatives to restore Everglades National Park (ENP) by redistributing and providing additional flows of water into the Park through U.S. 41, Tamiami Trail. After reviewing Congressional directives and targets, all previous reports, and previous and new alternatives and costs, the agencies tentatively recommend a plan consisting of two actions: 1) build a one-mile bridge in the project area's eastern segment and 2)raise the headwater stage constraint in the L-29 borrow Canal by 1 foot to 8.5 feet; which will require road mitigation on parts of U.S. 41 in the action area, located between S-333 on the west and S-334 on the east. This tentatively selected plan is called Alternative 3.2.2.a.

This document is available for review on the U.S. Army Corps of Engineers Website at http://www.saj.usace.army.mil/dp/mwdenp-c111/index.htm
 
Comment Period: Closed        Apr 9, 2008 - May 9, 2008
Document Content:
Executive Summary   (181.7 KB, PDF file)
Table of Contents   (66.3 KB, PDF file)
Introduction   (1011.7 KB, PDF file)
Cost Update of 2005 Approved Plan   (281.2 KB, PDF file)
Existing Conditions   (527.4 KB, PDF file)
Evaluation   (2.3 MB, PDF file)
Environmental Effects   (608.1 KB, PDF file)
Tentatively Selected Plan   (790.6 KB, PDF file)
Recommendations   (56.0 KB, PDF file)
Annex Front Cover   (36.7 KB, PDF file)
Annex A(2) - 404(b)(1) Evaluation   (359.2 KB, PDF file)
Annex A(3) - Statement of Findings   (207.2 KB, PDF file)
Annex B(1) - FWS Consultation   (22.4 KB, PDF file)
Annex B(2) - FWS March 6, 2008   (787.7 KB, PDF file)
Appendices Front Cover   (36.9 KB, PDF file)
Appendix A - Background   (147.5 KB, PDF file)
Appendix B(2) - Engineering Plates   (8.8 MB, PDF file)
Appendix C - Cost   (203.2 KB, PDF file)
Appendix E - Benefit Analysis   (244.6 KB, PDF file)
Appendix G - Scoping Comments   (11.8 MB, PDF file)
Appendix H - Prior NEPA Coordination   (7.0 MB, PDF file)
Appendix I FHWA 4f Exemption   (221.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.