Flamingo Commercial Services Plan Preferred Alternative and Financial Analysis (July 2008)


The initial public comment period for the Draft Plan ended on January 25, 2008. Based on the public comments received and additional analysis by the planning team, a Preferred Alternative was developed that largely includes elements from the Draft Plan's Alternatives B and C.

The Preferred Alternative is now available for comment for the next 30 days through Thursday, May 15, 2008. There are three documents available for comment: the full description of the Preferred Alternative, the Financial Analysis, which presents the business opportunity available for a potential concessioner, and the Floodplain Statement of Findings.
 
Comment Period: Closed        Apr 11, 2008 - May 15, 2008
Document Content:
Financial Analysis   (223.5 KB, PDF file)
Floodplain Statement of Findings   (712.4 KB, PDF file)
Preferred Alternative   (1.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.