Project Links
Padre Island National Seashore » Installation of 50' Communication Tower at Six Pigs facility » Document List » Document Contents
Houston Pipeline Communication Tower Environmental Assessment
This document analyzes the impacts of a proposed 50-foot communication tower at the Houston Pipeline Six Pigs Facility located at Padre Island National Seashore.
Comment Period:
Closed
Dec 16, 2007 - Jan 15, 2008
|
Document Content: |
Houston Pipeline Proposed Communication Tower Environmental Assessment
(788.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |