PEPC and Parkplanning will have an outage from 5 PM to 10 PM MT on July 19th due to network maintenance. Please plan and save your work accordingly.

Proposed Horizontally Drilled Crossing of the Natchez Trace Parkway


This EA examines different alternatives for accomplishing the transport of carbon dioxide across park lands, including a no-action alternative, and the potential environmental impacts of each.
 
Comment Period: Closed        Aug 21, 2007 - Sep 19, 2007
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.