Project Links
Natchez Trace Parkway » Install CO-2 Pipeline via Horizonal Directional Drill » Document List » Document Contents
Proposed Horizontally Drilled Crossing of the Natchez Trace Parkway
This EA examines different alternatives for accomplishing the transport of carbon dioxide across park lands, including a no-action alternative, and the potential environmental impacts of each.
Comment Period:
Closed
Aug 21, 2007 - Sep 19, 2007
|
![]() |
Document Content: |
EA-Proposed Horizontally Drilled Crossing of the NTP
(131.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |