Project Links
Curecanti National Recreation Area » Curecanti Resource Protection Study » Document List » Document Contents
3. Draft RPS/EIS (June 2007): Entire Document and Component Parts
The entire Draft RPS/EIS and its component parts are available here. For a description of the study's background and summary of recommendations, please also see PowerPoint presentation and Summary Brochure (click on "Document List" in the left column, then click on "1. Draft RPS/EIS Introductory Information").
Comments were accepeted for the Draft RPS/EIS from 7/13/2007 through October 22, 2007. The comment period is now closed.
Based on substantive comments received, the document revised, and a Final RPS/EIS prepared. That document is also available on this website.
If you have trouble opening any of the documents, please contact Dave Roberts at (970) 240-5432.
Comment Period:
Closed
Jul 13, 2007 - Oct 22, 2007
|