Lees Ferry Improvements - Final Environmental Assessment / Assessment of Effect


This EA has been prepared to analyze the environmental impacts associated with the proposed projects that would rehabilitate, upgrade and/or replace deteriorated utilities and facilities at the Lees Ferry area of Glen Canyon NRA.


PLEASE NOTE: To facilitate public review, this document is posted as a complete document (4 MB)and as sequential sub-sections (1-4) to aide in downloading from the internet.
 
Comment Period: Closed        Aug 28, 2006 - Sep 28, 2006
Document Content:
Lees Ferry Improvements - Section 1   (717.7 KB, PDF file)
Lees Ferry Improvments EA - Section 3   (582.3 KB, PDF file)
Lees Ferry Improvements EA - Section 4   (1010.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.