EA and FONSI for the Rehabilitate or Replace Deficient and Deteriorated Employee Housing at Lodgepole


This project will implement a Master Plan to rehabilitate or demolish and replace park housing units for seasonal and permanent staff. Replacement housing may include a mix of single-family, duplex, and multi-unit facilities using NPS prototypes. Each replacement or rehabilitated unit be suited for the site's climate and snow conditions. Existing residences and associated structures will be replaced, repaired, or converted to better meet current park housing needs. Existing garages structures will be demolished; garages and carports may be included in the new units. Site improvement work, including surface parking, will also be included. Underground utilities will be replaced and extended to all buildings. The existing access road will be realigned and repaved as needed to improve site circulation and parking for occupants, and to facilitate snow plowing operations and emergency egress.

The Environmental Assessment and Finding of No Significant Impact/Decision Record are linked in the documents list.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.